StoneFlair by Bradstone, StoneMaster Paving Light Grey Washed 800 x 200 - 32 Per Pack

Coverage(m2) £/m2
( inc. VAT )
£/pack
( inc. VAT )
32 Per Pack 5.12m2 £54.69 £280.01
Individual Unit 0.160m2 £62.89 £10.06
Sample n/a n/a £0.00
Delivery usually within 3-5 days
OR

Info

With great aesthetic appeal, the sleek looking contemporary StoneMaster creates the illusion of more space and is the last word in ultra modern patio solutions. StoneMaster is available in three buff shades replicating sandstone, and three grey shades to give a natural granite look.

For a complete hard landscaping solution why not join the front and back of your property together by laying a driveway in matching StoneMaster block paving.

StoneMaster 800 x 200 is not suitable for driveways.

Joint width: 2mm

Thickness: 80mm

Delivery

Deliveries normally occur between 8am and 6pm*. Once your order has been placed you will be contacted and provided with an exact date of delivery.

This vehicle will lower the product to the ground using an electric lift. The pallet of products is then pulled off using a manual pallet truck. It is imperative that the ground that the pallet is unloaded onto is flat and solid. Access may be needed for a rigid lorry (up to 20ft) otherwise additional delivery charges may be made. For larger orders alternative delivery methods can be arranged. Please call our office to discuss any delivery requirements or for clarification.

Our customer services team will advise how to prepare for receipt of ordered goods. Our delivery team are not responsible for any additional lifting or carrying of your goods.

We do not deliver items to multiple addresses.

All full packs and all orders containing at least one full pack will be delivered free of charge*. All orders of £300 or more (even if only containing individual units) will be delivered free of charge*. Orders for individual units with an order value of less than £300 usually have a flat delivery charge of £30.

*Delivery is free on orders with full packs except for deliveries to the postcodes AB, BT, DD, GY, HS, IM, IV, JE, KA27-28, KW, PA20+, PH, P030-41, TR21-25 and ZE. Please refer to our Delivery Policy for a table of charges or if you would like further information please call 0800 032 6306.

Delivery will normally be less than 7 days (typically 3-5 working days). Simply Paving will aim to contact you by email or directly by phone within two working days of your order to suggest a delivery date. If the date provided is unsuitable please get in touch and we will re-arrange the delivery date.

For further information please refer to our Delivery Policy.

*In summer months delivery times can be up until 8pm due to the volume of deliveries being made, however, this is a relatively rare occurrence.

Laying

Vegetation and top soil should be removed to an approximate depth of 200mm-250mm across the area to be paved.

The next stage is to set up edge restraints around the area to be paved (these may include existing walls) using block kerbs or concrete edging.

The area should then be back filled with 150mm of MoT/crusher run, compacted to 100mm.

Onto this, a layer of slightly damp sharp sand should be applied, to the depth of 50mm, and then compacted with a plate compactor. A second layer of sharp sand is then applied, to a depth of 20mm. Using the string lines, screeding rails and straight edge, this second layer of sharp sand needs to be levelled to the correct falls.

Place the blocks on top of the laying course, ensuring they are around 4-5mm above the desired finished level. Once all full blocks are laid, use a mechanical block splitter to cut the blocks required for infill pieces or at the retaining edges. Pieces of concrete block paving smaller than one third of a full block are best avoided. Once completed, sweep the area and compact with two or three passes of a lightweight plate compactor fitted with a neoprene soul plate to protect the surface of the paver.

Jointing of the block paving is preferably completed in dry periods. Apply kiln dried sand to the block paved area, then brush into the joints using a soft brush, ensuring the joints are filled fully.

Use the plate compactor described above on the paved area again, to push the sand into the joints. Once this has been done, check for any gaps in the jointing and fill where necessary, compacting again afterwards. The sand in the joints may need to be topped up for the first few months after the job is completed.
  Loading...